Feb 24,
So back when I was doing the 1/2 bathroom I was thinking about doing a accent wall in the bed room. When the Flooring was done with the seller. I know that the window of time before the funicher is brought back up is short. On Feb 23 I placed my order with Hobby Lobby to finsh the 1/2 bath.

First thing is to have a design/pattern. Mine is the hallway of the Gloucester Cathedral. Would love to see someday.
March 3-4,
Drawing out design and first two paint colors.
March 4-8
Working throw the night on and off to get a lot done.had to do 5 to 10 layers depending on the color and how translucent it is with one coat.
Mar 6,
doing some detail work
Mar 8-12,
Mar 13
Mar 14-15 Done at last and filled in area above and added accsent lighting
Hope you enjoyed thank you.